On time

 

Road stripper

To my utter surprise, the re-tarring of Main Road is complete, and on time as well! Considering that the section between Muizenberg and Kalk Bay is about 2 years behind schedule, I never thought that they would manage to complete the section in Lakeside in the promised two weeks, but somehow they did. Well done to the contractors.

For my last post, I posted the other end of this strange-looking machine, well here is (I think) the front, or possibly the back. It is a little difficult to tell. But what seems to happen is that it drives over the tar and rips it up, and then convey’s it along the conveyor belt at the back to drop into a nearby truck.

It’s a little scary seeing these guys in action, and to think about a machine that is powerful enough to just rip apart a road like a piece of jelly, but that is basically what this guy does. A great deal of respect please.

2 Comments

  1. Claire said:

    Love the angle on this piece of machinery.

    February 27, 2012
    Reply
    • Craig said:

      Thanks Claire, I was just about lying on the ground to get that angle

      February 27, 2012
      Reply

Leave a Reply

Your email address will not be published. Required fields are marked *